South Weber City Inspection Instructions:
-Please schedule ALL inspections through the City Office at 801-479-3177. The Building Inspector WILL NOT accept inspections requests made to him directly. -Site Inspections will be scheduled at the same time.
-Inspections are not scheduled for a specific time of the day – you may specify your preference of morning or afternoon.
-Inspections are performed as soon as possible depending upon the Building Inspector’s schedule and work load.
-Please have your building permit number when calling in for inspections.
-A minimum of 24-hour notice is required.
INSPECTIONS REQUIRED FOR NEW SINGLE-FAMILY DWELLING
- Sewer & Water Laterals – Test
- Footings – Includes setbacks verification
- Foundation – Reinforcement steel
- Under Floor Plumbing – Ground plumbing & test
- Temporary Power (Utah Power will be notified upon inspection approval)
- Four-Way – Rough framing, rough mechanical, rough electrical, rough plumbing and test
- Gas Line Clearance (Questar will be notified upon inspection approval)
- Insulation
- Permanent Power – power to panel; electrical service and ground (Utah Power will be notified upon inspection approval)
- Stucco Mesh
- Exterior Sheeting for Siding
- Brick Flashing
- Back Flow and Cross Connection
- Final – Electrical, Mechanical, Construction, Rough Grading
- Site Improvements – Curb, Gutter & Sidewalk
INSPECTIONS REQUIRED FOR GARAGE/CARPORT/AWNING
- Footings – Includes setbacks verification
- Foundation
- Four-Way – Rough framing, rough mechanical, rough electrical, rough plumbing and test
- Final – Electrical, Mechanical, Construction, Rough Grading
INSPECTIONS REQUIRED FOR RESIDENTAL HOME ADDITION
- Footings – Includes setbacks verification
- Foundation – Reinforcement steel
- Under Floor Plumbing – Ground plumbing & test
- Temporary Power (Utah Power will be notified upon inspection approval)
- Four-Way – Rough framing, rough mechanical, rough electrical, rough plumbing and test
- Gas Line Clearance (Questar will be notified upon inspection approval)
- Insulation
- Permanent Power – power to panel; electrical service and ground (Utah Power will be notified upon inspection approval)
- Stucco Mesh
- Exterior Sheeting for Siding
- Brick Flashing
- Back Flow and Cross Connection
- Final – Electrical, Mechanical, Construction, Rough Gradin